National Roads B20, B305 and BGL11, Roundabout

Berchtesgaden, Germany
Location
Berchtesgaden, Germany
Info
New construction of a roundabout with 3 bridges over the 3 rivers Ache
Client
Construction authority Traunstein
Planning period
2000 - 2003
Construction period
2004 - 2007
Services
Traffic planning: basic evaluation, preliminary design, draft design, approval design
Total Length
0.4 km

New construction of a double-lane roundabout at the station Berchtesgaden with an exterior diameter of 85 m, lane width of around 8.5 m and an exterior circumference of 270 m, approx. 100 m on road bridges

Back