Allach Tunnel

For more capacity and less congestion

1.030
Metres of tunnel length

The tunnel connects the Schwabing district with the south and east of Munich.

Tunnel renovation for more capacity

  • The possible temporary increase from six to eight lanes will reduce congestion times on the heavily used route and expand the capacity of the tunnel.
  • The Allach Tunnel will be upgraded or partially renewed as part of this project. Associated with this are various engineering interventions and a comprehensive chloride remediation.
Site
Munich, Germany
Building contractor/client
Motorway Directorate of Southern Bavaria

Planning period

2018–2020

Service areas

Project management, creation of the BIM model, underground cable construction planning, object planning for traffic facilities, planning of traffic routing during the construction period, as-built surveying

Clear width
2 × 16.10 m
Tunnel length
1,030 m
Planned construction time
Eight years in two construction phases