Motorway A9, Munich – Nuremberg, Noise Protection Freimann
Munich, Germany
Location
Munich, Germany
Client
State of Bavaria, represented by German highway authority
Total Length
approx. 3 km
Services
preliminary, approval and final design, preparation and evaluation of tenders, workshop drawings and project management
Planning period
2001 - 2004
Construction period
2004 - 2005
![](/typo3temp/assets/_processed_/9/9/csm_ausbauA9002_8c3a167172.jpg)
![](/typo3temp/assets/_processed_/4/f/csm_ausbauA9003_ac5a22935b.jpg)
![](/typo3temp/assets/_processed_/4/6/csm_ausbauA9004_8474f85d44.jpg)
![](/typo3temp/assets/_processed_/a/1/csm_ausbauA9005_483f50cf43.jpg)
![](/typo3temp/assets/_processed_/c/2/csm_ausbauA9006_5c770a286a.jpg)
![](/typo3temp/assets/_processed_/a/d/csm_ausbauA9007_7cf33d46b6.jpg)
![](/typo3temp/assets/_processed_/4/9/csm_ausbauA9008_cb5d4a6311.jpg)
![](/typo3temp/assets/_processed_/b/5/csm_ausbauA9009_6ee0098b0e.jpg)
![](/typo3temp/assets/_processed_/0/9/csm_ausbauA9010_2a5e16b197.jpg)
![](/typo3temp/assets/_processed_/6/2/csm_ausbauA9012_d995ea7b46.jpg)
The construction is situated in the northern part of Munich on both sides of the motorway A9 Nuremberg-Munich between the junction and the bridge of Freimann. The curved noise protection wall with a maximum high of 9.0 m is covered inside by high-absorptive aluminium corrugated iron sheets and outside by coffered aluminium panels. The noise protection extends over a distance of approx. 3 km.