High-speed Railway Line from Beijing to Shanghai, Nanjing Big Bridgem, Construction Supervision
China
Client
MOR Ministry of Railway, China / CARS, China Academy of Railway Science, China
Total length
1,615 m total, spans up to 336 m
Services
Supervision – Construction management
Speed
300 km/h
Planning period
2006 – 2009
Construction period
2006 – 2010
![](/typo3temp/assets/_processed_/3/2/csm_BigbridgeAnsicht_West_1_02_5c455a8d37.jpg)
![](/typo3temp/assets/_processed_/7/0/csm_37963e8387_1a932e6f7f.jpg)
![](/typo3temp/assets/_processed_/3/6/csm_BigbridgeAnsicht_West_2_02_62b6dcf89e.jpg)
![](/typo3temp/assets/_processed_/c/f/csm_BigbridgeCIMG5726_res_02_7cda0b4a60.jpg)
![](/typo3temp/assets/_processed_/d/9/csm_BigbridgeCIMG5765_resize_02_19b6aec315.jpg)
![](/typo3temp/assets/_processed_/d/8/csm_BigbridgeDSCN3990_resize_08_feb691e4b8.jpg)
![](/typo3temp/assets/_processed_/2/a/csm_BigbridgeIMGP0074_2_08_46ec591448.jpg)
![](/typo3temp/assets/_processed_/7/6/csm_BigbridgeVorlandbr_cke_1_08_7591b5d4a0.jpg)
![](/typo3temp/assets/_processed_/f/2/csm_BigbridgeVorlandbr_cke_2_08_76b1963651.jpg)
Supervision for work preparations, steel constructions at the plant and their execution; training of site supervision for engineering structures and superstructure as well as production of steel system elements. Control of supervision of assembly on site.